Nehodí sa? Žiadny problém! Tovar môžete vrátiť až do 30 dní
S darčekovým poukazom nešliapnete vedľa. Obdarovaný si za darčekový poukaz môže vybrať čokoľvek z našej ponuky.
Až 30 dní na vrátenie tovaru
As large physical capital stock projects need long periods to be built, a time-to-build specification is incorporated in factor demand models. Time-to-build and adjustment costs dynamics are identified since by the first moving average dynamics, whereas by the latter autoregressive dynamics are induced. Empirical evidence for time-to-build is obtained from data from the Dutch construction industry and by the estimation result from the manufacturing industry of six OECD countries.
Ahoj! Som Libroamiko, tvoj knižný radca.
Ako ti môžem pomôcť?